Tunnel (NATM : New Austrian Tunneling Method)



Introduction


  • The New Austrian Tunneling Method (NATM) was first introduced by NATR method in the early 1960s by the Ravicewicz, Austria.
  • The previous tunnel method requires the support material to bear the load generated by the excavation around the excavation surface, which requires a lot of space between the ground and the support.
  • As time goes by, the ground is relaxed, and the heavy load acts on the support, resulting in many ground deformations.
  • The basic principle of NATM is to use rock self-supporting force to fix with Rock Bolt and reinforce with Shotcrete and support material to stabilize the ground and excavate tunnel.
  • This method is economical compared to the previous method, has the advantage of suppressing the deformation of the surrounding ground due to the excavation, it is mainly used as the construction method of the downtown tunnel because it can determine the safety by continuous measurement.

Special Feature


The ground itself is the main material.
Shotcrete, rock bolts, and steel support are the means of supporting the ground.
It can be applied from soft ground to very strong rocks.
Measurements are made during construction to reflect design and construction.
Economical tunnels can be built.

Site list


Great Train eXpress(GTX) B Line Section 4

Earth work, Construction of structure

Hyundai E&C Mabuk R&D Center

Disposal Tunnel Excavation & Low-pH Lining

2025

Gwangju Urban Railway Line 2 Phase 1 Section 6 construction work

Earth work, Construction of structure

2024

Highway No. 29 Sejong-Pocheon (Anseong-Yongin) construction (Section 5)

Earth work, Construction of structure

2023

Samsung-Dongtan GTX-A Line Section 3

Lining reinforcement work

2022

Extension of Incheon Subway Line No. 1 to Gumdan (Section 1)

Earth work, Tunnel (Shield TBM)

2021

Samsung-Dongtan GTX-A Line Section 4 (Transfer Center)

Earth work, Construction of structure

2020

Seoul Metropolitan Railway Line 7 Seoknam Extension Section 1 construction work

Earth work, Construction of structure

2020

Samsung-Dongtan GTX-A Line Section 4 (Transfer Center)

Earth work, Bridge construction, Tunnel (NATM) 2,470m

2019

Samsung-Dongtan GTX-A Line Section 4 (Seongnam Station)

Earth work, Construction of structure

2019

Sejong-Pocheon Expressway National Highway Construction (Section 5)

Earth work, Bridge construction 795m, Tunnel (NATM) 5,025m

2018

Gwangyeong-Yeosu Power Cable Tunnels

Earth work, Tunnel (NATM) 283m

2017

Bukdangjin-Shintangjeong Power Cable Tunnels, Dangjin

Earth work, Tunnel (MESSER SHEILD) 283m

2017

Deagok-Sosa Double track subway, [Section no.5]

Earth work, Tunnel (NATM) 1,912m

2017

Seoul Metropolitan Rapid Transit 7-line Seoknam extention (Section No.1) , Bupyeong

Earth work, Tunnel (NATM) 1,389m

2016

Jungang-line , Dodam-Youngcheon 1-B zone, double track subway roadbed project , Danyang

Earth work, Tunnel (NATM) 2,080m

2015

The construction works of the Highway of Guri-Pocheon (Section No. 3) ,Namyangju

Earth work, Bridge construction, Tunnel (NATM) 2,470m

2014

The construction works of the Railway of Wonju-Gangneung (Section No. 2 ) , Uigwan Tunnel , Wonju

Earth work, Tunnel (NATM) 1,550m

2013

The construction works of the Metropolitan Express Railway of Suseo-Pyeongtak (Section No. 1-2), Seoul

Tunnel (NATM) 2,360m, Box Structure 387m

2012